Calpine Wolfskill Energy Center | Fairfield, CA
Owner | Calpine
General Contractor | ARB, Inc.
Project consisted of a power line interconnection tap in the City of Fairfield.
Lawrence Livermore National Laboratory Ground Plane Phase I | Livermore, CA
Owner | Lawrence Livermore National Laboratory
General Contractor | Jacobs Sverdrup
Layout and welding of aluminum ground plane enclosure and supports.
Northrop Grumman Marine Systems | Sunnyvale, CA
Owner | Northrop Grumman
Scope included design, engineering, and construction of multiple load banks.
Pico Power Plant Underground | Santa Clara, CA
Owner | Silicon Valley Power
General Contractor | ARB, Inc.
Installed 30,000 feet of bare copper wire and 30,000 feet of underground conduit.
Wesgo | Hayward, CA
General Contractor | DPR Construction
Relocation of ceramic manufacturing plant to existing vacant building.
Western Digital SJB/MV Dist | Fremont, CA
Owner | Western Digital
General Contractor | Chevron Energy Solutions
Included the coordination and installation of high voltage, control, and power quality monitoring systems and building of a substation.
|